{"id":1680,"date":"2016-04-15T16:08:52","date_gmt":"2016-04-15T07:08:52","guid":{"rendered":"http:\/\/sutrasys.com\/hawkeye\/?p=1680"},"modified":"2019-10-15T20:28:52","modified_gmt":"2019-10-15T11:28:52","slug":"post-1680","status":"publish","type":"post","link":"https:\/\/sutrasys.com\/hawkeye\/post-1680\/","title":{"rendered":"HawkEye Version 3.12 Released"},"content":{"rendered":"<p>\u2605\u2605\u2605\u3000<span>NEW Version 3.12 New Features and Improvements<\/span>\u3000\u2605\u2605\u2605 \u3000\u3000\u3000\u3000\u3000\u3000\u3000\uff1c<span>Overview<\/span>\uff1e<\/p>\n<p>\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500 <br \/> \uff11\uff09<span>BOM Management Feature.<\/span><br \/> \uff12\uff09<span>Introducing custom field in Project.<\/span><br \/> \uff13\uff09Schedule -&gt;\u00a0<span>Gantt display of baseline schedule.<\/span><br \/> \uff14\uff09Report -&gt;\u00a0<span>Added \u201cCost EVM based \u201d option to the method of calculating the % Complete.<\/span><br \/> \uff15\uff09Program -&gt;\u00a0<span>Status reports and Gantt display of program.<\/span><br \/> \uff16\uff09Control Panel -&gt;\u00a0<span>Department Super-user, Login management.<\/span><br \/> \uff17\uff09<span>Control Panel -&gt; Enable or Disable Resource.<\/span><br \/> \uff18\uff09<span>Enhanced User Interface including Dashboard functions.<\/span><\/p>\n<p>\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500<\/p>\n<p>&nbsp;<\/p>\n<p>\u25a0\u25a0<strong>\uff11\uff09<span>BOM Management function<\/span>\u3000<\/strong>\u25a0\u25a0<\/p>\n<p>\u25ce<span>Typical Engineering Project involves design and manufacturing of parts.\u00a0\u00a0<\/span>BOM\u00a0<span>Module will allow users to track <\/span><span>LifeCycle\u00a0<\/span><span>of <\/span><span>each part<\/span><span>.<\/span><br \/> \u25ce<span>BOM <\/span><span>manages the parts in tree structure. It is easy to manage using parent \/ child <\/span><span>format<\/span><span>.<\/span><br \/> <span>\u00a0 \u00a0Parts <span>are classified into OEM &amp; Raw material (Including <\/span><span>in-house\u00a0<\/span><span>production<\/span><span>), <\/span><span>keep information <\/span><span>of vendors <\/span><span>&amp; customers.\u00a0<\/span><\/span><br \/> \u25ce<span>There is a sequence of stages of part such as Design <\/span><span>&#8211;<\/span><span>&gt;Release<\/span><span>&#8211;<\/span><span>&gt; <\/span><span>Purchase <\/span><span>Order<\/span><span>&#8211;<\/span><span>&gt;Approval<\/span><span>&#8211;<\/span><span>&gt;Invoice<\/span><span>&#8211;<\/span><span>&gt;Payment<\/span><span>. Various\u00a0types of reports like Production report, Vendor report, Quality report\u00a0 are available.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>\u25a0\u25a0<strong>\uff12\uff09<span>Introducing custom field in Project<\/span><\/strong>\u3000\u25a0\u25a0<\/p>\n<p>\u25ce<span>You can now manage the details of your project by setting up your own custom fields.<\/span>\u00a0<br \/> \u25ce<span>Up to 10 Custom fields can be used.<\/span><span><span>\u00a0<\/span><\/span> \u3000<\/p>\n<p>&nbsp;<\/p>\n<p>\u25a0\u25a0<strong>\uff13\uff09 Schedule -&gt;\u00a0<span>Gantt display of baseline schedule\u00a0<\/span><\/strong>\u25a0\u25a0<\/p>\n<p>\u25ce<span>Until now once schedule is approved, it remains in the approval history. Now data <\/span><span>comparison between the current schedule with baseline from history is possible<\/span><span>.\u00a0Baseline schedule can be modified.<\/span><br \/> \u25ce<span>Visual comparison with the current schedule itself is possible in status report.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>\u25a0\u25a0<strong>\uff14\uff09Report -&gt; <span>Added \u201cCost EVM based \u201d option to the method of calculating the % Complete<\/span><span>\u00a0<\/span><\/strong>\u25a0\u25a0<\/p>\n<p>\u25ce<span>Until now, the % Complete has been calculated using either the Efforts or\u00a0Duration based method, but now we have added Cost EVM Method.<\/span> <br \/> \u25ce<span>The status report graph changes depending on the option.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>\u25a0\u25a0<strong>\uff15\uff09Program -&gt;\u00a0<span>Status reports and Gantt display of Program<\/span><\/strong>\u3000\u25a0\u25a0 <br \/> \u25ceNow\u00a0a<span>\u00a0Program will have status report with calculations <\/span><span>option <\/span><span>as <\/span><span>Cost EVM.<\/span><br \/> \u25ce<span>Use Program schedule Gantt <\/span><span>view if <\/span><span>you want to monitor <\/span><span>projects collectively in a &#8220;program\u201c and overall <\/span><span>status <\/span><span>reports.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>\u25a0\u25a0<strong>\uff16) Control Panel -&gt;\u00a0<span>Department Super-User, Login management\u00a0<\/span><\/strong>\u25a0\u25a0<\/p>\n<p>\u25ce<span>Department Super user authority has been newly introduced. A department super user can view all project data for that department and its subordinate departments.<\/span><br \/> \u25ce<span>It can be set from both the Department node and Login management node.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>\u25a0\u25a0<strong>\uff17) <span>\u00a0Control Panel -&gt; Enable or Disable the resource\u00a0<\/span><\/strong>\u25a0\u25a0<\/p>\n<p>\u25ce<span>You can now enter the schedule to enable \/ disable resource.\u00a0<\/span><br \/> \u25ce<span>You cannot\u00a0do\u00a0the time sheet entry\u00a0if the resource\u00a0is disabled. You can now see the history of\u00a0active duration on a separate screen.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>\u25a0\u25a0<strong>\uff18) <span>Enhanced user interface including dashboard functions\u00a0<\/span><\/strong>\u25a0\u25a0<\/p>\n<p>\u25ce<span>A Cost Graph has been added to the Dashboard.\u00a0<\/span><br \/> \u25ceA Quick link feature has been introduced, With this, user can switch to recent accessed page of any project and module with same login ID.\u00a0<br \/> \u25ceYou can choose Skin settings(Themes of HawkEye) from available 4 types.<br \/> \u25ceYou can now upload \/ download XML data. User can update data without logging in. It requires dedicated URL.<br \/> \u25ce<span>Job Scheduler is a scheduling tool to execute defined jobs <\/span><span>as per <\/span><span>frequency(daily\/weekly).\u00a0User can<\/span>\u00a0Edit\/Operate\u00a0Job Scheduler.<\/p>\n<p>\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500 \u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500<\/p>\n<p><span>For HawkEye Demonstration and free trial\uff1a<a class=\"moz-txt-link-abbreviated\" href=\"mailto:marketing@sutrasys.com\">marketing@sutrasys.com<\/a> Please feel free to contact us.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u2605\u2605\u2605\u3000NEW Version 3.12 New Features and Improvements\u3000\u2605\u2605\u2605 \u3000\u3000\u3000\u3000\u3000\u3000\u3000\uff1cOverview\uff1e \u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500 \uff11\uff09BOM Management Feature. \uff12\uff09Introducing custom field in Project. \uff13\uff09Schedule -&gt;\u00a0Gantt display of baseline schedule. \uff14\uff09Report -&gt;\u00a0Added \u201cCost EVM based \u201d option to the method of calculating the % Complete. \uff15\uff09Program -&gt;\u00a0Status reports and Gantt display of program. \uff16\uff09Control Panel -&gt;\u00a0Department Super-user,<a href=\"https:\/\/sutrasys.com\/hawkeye\/post-1680\/\" class=\"read-links\">\u7d9a\u304d\u3092\u8aad\u3080<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1680","post","type-post","status-publish","format-standard","hentry","category-info"],"_links":{"self":[{"href":"https:\/\/sutrasys.com\/hawkeye\/wp-json\/wp\/v2\/posts\/1680","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sutrasys.com\/hawkeye\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sutrasys.com\/hawkeye\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sutrasys.com\/hawkeye\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sutrasys.com\/hawkeye\/wp-json\/wp\/v2\/comments?post=1680"}],"version-history":[{"count":21,"href":"https:\/\/sutrasys.com\/hawkeye\/wp-json\/wp\/v2\/posts\/1680\/revisions"}],"predecessor-version":[{"id":1892,"href":"https:\/\/sutrasys.com\/hawkeye\/wp-json\/wp\/v2\/posts\/1680\/revisions\/1892"}],"wp:attachment":[{"href":"https:\/\/sutrasys.com\/hawkeye\/wp-json\/wp\/v2\/media?parent=1680"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sutrasys.com\/hawkeye\/wp-json\/wp\/v2\/categories?post=1680"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sutrasys.com\/hawkeye\/wp-json\/wp\/v2\/tags?post=1680"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}