HawkEye Version 3.12 Released

April 15, 2016

★★★ NEW Version 3.12 New Features and Improvements ★★★        <Overview

────────────────────────────────────────────────────
1)BOM Management Feature.
2)Introducing custom field in Project.
3)Schedule -> Gantt display of baseline schedule.
4)Report -> Added “Cost EVM based ” option to the method of calculating the % Complete.
5)Program -> Status reports and Gantt display of program.
6)Control Panel -> Department Super-user, Login management.
7)Control Panel -> Enable or Disable Resource.
8)Enhanced User Interface including Dashboard functions.

────────────────────────────────────────────────────

 

■■1)BOM Management function ■■

Typical Engineering Project involves design and manufacturing of parts.  BOM Module will allow users to track LifeCycle of each part.
BOM manages the parts in tree structure. It is easy to manage using parent / child format.
   Parts are classified into OEM & Raw material (Including in-house production), keep information of vendors & customers. 
There is a sequence of stages of part such as Design >Release> Purchase Order>Approval>Invoice>Payment. Various types of reports like Production report, Vendor report, Quality report  are available.

 

 

■■2)Introducing custom field in Project ■■

You can now manage the details of your project by setting up your own custom fields. 
Up to 10 Custom fields can be used.   

 

■■3) Schedule -> Gantt display of baseline schedule ■■

Until now once schedule is approved, it remains in the approval history. Now data comparison between the current schedule with baseline from history is possible. Baseline schedule can be modified.
Visual comparison with the current schedule itself is possible in status report.

 

■■4)Report -> Added “Cost EVM based ” option to the method of calculating the % Complete ■■

Until now, the % Complete has been calculated using either the Efforts or Duration based method, but now we have added Cost EVM Method.
The status report graph changes depending on the option.

 

■■5)Program -> Status reports and Gantt display of Program ■■
◎Now a Program will have status report with calculations option as Cost EVM.
Use Program schedule Gantt view if you want to monitor projects collectively in a “program“ and overall status reports.

 

■■6) Control Panel -> Department Super-User, Login management ■■

Department Super user authority has been newly introduced. A department super user can view all project data for that department and its subordinate departments.
It can be set from both the Department node and Login management node.

 

■■7)  Control Panel -> Enable or Disable the resource ■■

You can now enter the schedule to enable / disable resource. 
You cannot do the time sheet entry if the resource is disabled. You can now see the history of active duration on a separate screen.

 

■■8) Enhanced user interface including dashboard functions ■■

A Cost Graph has been added to the Dashboard. 
◎A Quick link feature has been introduced, With this, user can switch to recent accessed page of any project and module with same login ID. 
◎You can choose Skin settings(Themes of HawkEye) from available 4 types.
◎You can now upload / download XML data. User can update data without logging in. It requires dedicated URL.
Job Scheduler is a scheduling tool to execute defined jobs as per frequency(daily/weekly). User can Edit/Operate Job Scheduler.

──────────────────────────── ────────────────────────────