HawkEye Version 3.12 Released

April 15, 2016

★★★ NEW Version 3.12 New Features and Improvements ★★★        <Overview>

────────────────────────────────────────────────────
1)BOM Management Feature.
2)Introducing custom field in Project.
3)Schedule -> Gantt display of baseline schedule.
4)Report -> Added “Cost EVM based ” option to the method of calculating the % Complete.
5)Program -> Status reports and Gantt display of program.
6)Control Panel -> Department Super-user, Login management.
7)Control Panel -> Enable or Disable Resource.
8)Enhanced User Interface including Dashboard functions.

────────────────────────────────────────────────────

 

■■1)BOM Management function ■■

◎Typical Engineering Project involves design and manufacturing of parts.  BOM Module will allow users to track LifeCycle of each part.
◎BOM manages the parts in tree structure. It is easy to manage using parent / child format.
   Parts are classified into OEM & Raw material (Including in-house production), keep information of vendors & customers. 
◎There is a sequence of stages of part such as Design –>Release–> Purchase Order–>Approval–>Invoice–>Payment. Various types of reports like Production report, Vendor report, Quality report  are available.

 

 

■■2)Introducing custom field in Project ■■

◎You can now manage the details of your project by setting up your own custom fields. 
◎Up to 10 Custom fields can be used.   

 

■■3) Schedule -> Gantt display of baseline schedule ■■

◎Until now once schedule is approved, it remains in the approval history. Now data comparison between the current schedule with baseline from history is possible. Baseline schedule can be modified.
◎Visual comparison with the current schedule itself is possible in status report.

 

■■4)Report -> Added “Cost EVM based ” option to the method of calculating the % Complete ■■

◎Until now, the % Complete has been calculated using either the Efforts or Duration based method, but now we have added Cost EVM Method.
◎The status report graph changes depending on the option.

 

■■5)Program -> Status reports and Gantt display of Program ■■
◎Now a Program will have status report with calculations option as Cost EVM.
◎Use Program schedule Gantt view if you want to monitor projects collectively in a “program“ and overall status reports.

 

■■6) Control Panel -> Department Super-User, Login management ■■

◎Department Super user authority has been newly introduced. A department super user can view all project data for that department and its subordinate departments.
◎It can be set from both the Department node and Login management node.

 

■■7)  Control Panel -> Enable or Disable the resource ■■

◎You can now enter the schedule to enable / disable resource. 
◎You cannot do the time sheet entry if the resource is disabled. You can now see the history of active duration on a separate screen.

 

■■8) Enhanced user interface including dashboard functions ■■

◎A Cost Graph has been added to the Dashboard. 
◎A Quick link feature has been introduced, With this, user can switch to recent accessed page of any project and module with same login ID. 
◎You can choose Skin settings(Themes of HawkEye) from available 4 types.
◎You can now upload / download XML data. User can update data without logging in. It requires dedicated URL.
◎Job Scheduler is a scheduling tool to execute defined jobs as per frequency(daily/weekly). User can Edit/Operate Job Scheduler.

──────────────────────────── ────────────────────────────

For HawkEye Demonstration and free trial:marketing@sutrasys.com Please feel free to contact us.